|
|
Phase I
View of damaged membrane area, identified for repair.
Phase II
Deteriorated areas removed, and prepared for new membrane.
|
|
|
Phase III
Installed base (waterproofing) coat.
Phase IV
Installed top (wear) coat.
|
|
|

Groundstar Systems (1987) Ltd.
1556 Erin Street
Winnipeg, Manitoba, Canada, R3E 2T1
Tel: (204) 694-4899
Fax: (204) 694-7249
e-mail:
info@groundstar.mb.ca
|